SEGA Weekly Traffic Interruption Advisory Thru May 19, 2023

SOUTHEAST GA – Georgia DOT continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, May 13 through Friday, May 19.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.

Interstate 95
I-95 McIntosh County
Champney R. Bridge (MP 45.5) to Darien R. Bridge
Lane Closures Monday- Thursday 7pm-7am &
Weekends – Friday 9pm until Monday 5am
Bridge Maintenance/Rehabilitation thru October 2023

I-95 North at Florida State Line Nassau County, Florida
Lane closures at St. Mary’s River Bridge
Tuesday from 9:30 pm to 3:30 pm
Florida DOT routine bridge inspection

Interstate 16
I-16 (at SR 307) Chatham County
Lane Closures for DDI Construction on I-16 & SR 307
Monday – Saturday
· I-16 Eastbound from 9 a.m. to 4 p.m.
· I-16 Westbound from 8 a.m. to 3 p.m.
· SR 307 North from 9 a.m. to 4 p.m.
· SR 307 South from 8 a.m. to 3 p.m.
Continues thru end of June 2023

Bridge & Road Closures with Detours

SR 520 at Satilla River Overflow Bridge Brantley County
Lane Closures for Bridge Replacement
Expected to Reopen July 2024
Single Lane Traffic in Both Directions thru Work Zone
On-site Detour: WB Traffic Shift to EB Bridge

Ten Mile Church Road at 10 Mile Creek Bacon County
Road Closure for Bridge Replacement
Expected to Reopen in July 2023
Detour via Radio Station Rd, S Pierce St., SR 32, SR 203

Bell Telephone Road Jeff Davis County
Road Closure for Bridge Replacement
Expected to Reopen July 2023
Detour via Ira Graham Rd, Bridgeford Church Rd, Philadelphia Church Rd, Taylor Rd, Post Rd

Bridge Construction, Rehabilitation, and Maintenance
State Route 25 Chatham County
Appleby Road (MP 19) to the South Carolina State Line
Alternating Lane Closures for Bridge Construction
Monday – Saturday 9am to 4pm

SR 4/US 1 Over Altamaha River Appling-Toombs Co.
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Lane Closures Monday thru Friday, 7am to 6pm
Bridge Construction Activities thru May 2023

Resurfacing
SR 204/Fort Argyle Rd Chatham County
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
Monday – Friday, 7pm to 6am

SR 26/HWY 80 Chatham County
From Bourne Ave to Wilkes Street
Daily/Nightly Lane Closures 9pm to 6am

SR 196/SR 119 Liberty County
From Gate 1 to Gate 5 (MP 4.67 to 7.15)
Lane Closures 7pm to 5am Friday – Saturday

SR 119 Liberty County
From Airport Rd to SR 138 (MP.0 to 4.67)
Lane Closures 7pm to 5am Friday – Saturday

SR 21 Business 21/Leola Rd Screven County
MP 16.58 to MP 0
Daily Lane Closure & Flagging Operation
7am to 7pm
1/9/2023 – 5/22/2023

SR 30 Evans County
Tattnall/Evans County Line to Cedar St.
Daily Lane Closure
7am to 7pm
4/24/23 – 6/30/23

Old Highway 250 Tattnall County
Mainline Left/Right Lane Closed due to Shoulder Widening
Monday – Saturday 7am to 8pm
Starting 2/27/2023 – 9/30/2023

SR 67 Bypass Bulloch County
Fair Road to SR 26/US80
Daily Lane Closure 7am to 8pm
Resurfacing 3/20/2023 – 5/31/2023

SR130 Montgomery/Toombs County
From SR135 to US1/SR4
Daily Lane Closures 7am to 7pm
4/3/2023 – 5/31/2023

SR 303 Glynn County
From SR 520 to SR 25
Daily Lane Closures 7pm to 6am
4/16/2023 – 8/31/2023

SR 25 Camden County
From Florida Line to MLK Blvd (Kingsland)
Daily Lane Closures
Nightly Lane Closures within City Limits 7pm to 5am
5/5/2023 – 12/31/2023

Other Traffic Interruptions
SR 169 Evans County
From SR 129 to Riverside Drive
Single Lane Closure on SR 169.
Construction of New Drive for Brewton Park with Flagging Operation
Brewton Park Boat Ramp Access will Remain Open to Public
Daily/Nightly Construction 8am to 7pm Right Lane
Starting 5/15/2023 – 5/26/2023

SR23/SR57 Tattnall County
From SR169 to SR121
Daily Lane Closures for Road Widening
8am to 3pm
Starting 12/20/2022 – 12/10/2023

SR 21/SR 30 Chatham County
I-95/SR 405 to Berrien Rd
Nightly Lane Closures for Work on Striping
Monday – Friday 7pm to 6am

SR 40 Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 9/30/2023

SR 21 MP 17.7 to MP 15.0 Chatham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Lane Closures Anytime Saturday and Sunday
3/03/2023 – 7/30/2024

SR 25/Burnsed Blvd. Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm
Burnsed Boulevard reduced to two lanes from Hwy 80 through the intersection of SR 25. Traffic will move to the southbound lanes,
which will become one lane in each direction.
SR25 North from Bay Street closed to through traffic. Only trucks
needing access to Foundation Drive.
Advisory: Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling thru work zones. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Memorial Day holiday work restrictions will be in place from Friday, May 26, 2023, at 12 p.m. to Monday, May 29, 2023, at 10 p.m. No road closures or work that restricts or interferes with traffic will be conducted on interstates during this time frame.

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Previous Story

Interstate Closure Advisory for the 16@95 Improvement Projects Thru May 20, 2023

Next Story

Bulloch Touch A Truck Event Slated for May 22

NEVER MISS A STORY!
Sign Up For Our  Newsletter
Get the latest headlines and stories - and even exclusive content!- sent right to your inbox.
Stay Updated
Give it a try, you can unsubscribe anytime.
close-link